Neglected commercial courtyard with cracked concrete, leggy overgrown shrubs, and standing water pooling on ungraded surface
BEFORE — Neglected Courtyard
Completed landscape transformation with architectural plantings, permeable pavers, and integrated LED path lighting at dusk
AFTER — Engineered Outdoor Room

From Liability
to Landmark.

Meridian Commerce Park, Austin TX  ·  14,200 sq ft  ·  Completed in 11 weeks

Scroll
37
Projects Completed
94%
Plant Survival at 18 Months
2.4M
Square Feet Installed
11wk
Avg Weeks to Completion
Landscape architect reviewing topographic survey drawings on a drafting table with measuring tools and site photographs
PHASE 01
Site Analysis

We read the land before we touch it.

Every Groundwork engagement begins with a licensed survey and a full-day site assessment — drainage patterns, soil compaction, sun angles at each season, and existing utility conflicts mapped before a single shovel moves.

You receive a written site report with topographic overlays, water-flow diagrams, and a frank list of what the site is fighting against. No surprises in week six.

100%of projects include written site report

They found a subsurface drainage problem the previous contractor missed for three years. Showed it to us on paper before they quoted a single dollar.

Marcus Webb, Property Manager, Meridian Commerce Park
Detailed landscape design rendering showing architectural plantings, paver layout, and LED lighting plan for commercial courtyard
PHASE 02
Concept Design

A 3D rendering before a single plant is ordered.

Our design team works in BIM-grade landscape software. You see your space in three dimensions — hardscape materials, plant massing at five-year and ten-year maturity, lighting placement, and drainage infrastructure — before the proposal is signed.

Revisions are included. We iterate until the plan reflects exactly what you're committing to build.

3revision rounds included in every design fee

We'd never seen our own backyard modeled in 3D before. We changed the patio orientation on the second revision — saved us from a decision we'd have regretted.

Diane Kowalski, Homeowner, West Lake Hills
Ready to move forward?

Every project starts with a site walk.

Flat-fee site analysis. Written scope. Fixed-price proposal. No hourly surprises.

Stone and paver material sample board laid out on a work table showing flagstone, gravel, and steel edging options for client selection
PHASE 03
Material Selection

Stone, steel, and soil — specified to last.

Groundwork maintains a curated supplier network for permeable pavers, native stone, architectural steel edging, and amended soil blends engineered for Central Texas drainage conditions. Every material is physically sampled and approved before purchase.

No substitutions without written notice. The sample board you approve is the material that arrives on the truck.

0unauthorized material substitutions — ever

The sample board meeting felt like choosing finishes for a custom home. That's exactly the level of control we needed on a public-facing property.

Tomás Reyes, Director of Facilities, Barton Creek Office Campus
Groundwork installation crew operating compact excavator while laying permeable pavers in a commercial courtyard transformation project
PHASE 04
Installation

Heavy equipment, clean edges, no excuses.

Our install crews are W-2 employees — not day labor — trained on our grading tolerances and edging standards. We run a daily site log with photos timestamped to the plan. You can check progress without making a site visit.

Drainage infrastructure is inspected and photographed before backfill. Hardscape is laser-leveled. Every plant is tagged with species, source nursery, and installation date.

68%reduction in surface water runoff post-install

They sent photos every afternoon at 4pm. I never had to wonder what was happening on my property. That's rare in this trade.

Priya Sundaram, General Contractor, Sundaram Build Group
Ready to move forward?

Every project starts with a site walk.

Flat-fee site analysis. Written scope. Fixed-price proposal. No hourly surprises.

Mature landscape installation one year after completion showing established architectural plantings, healthy ground cover, and LED path lighting at dusk
PHASE 05
Aftercare

The work doesn't end at substantial completion.

Every Groundwork project includes a 12-month aftercare program: two seasonal visits, a soil amendment schedule, irrigation calibration, and a single point of contact for plant replacement under our establishment warranty.

At 18 months, we walk the site with you, photograph against the original install documentation, and deliver a written assessment. Most clients use this meeting to scope phase two.

94%plant survival rate at 18-month assessment

Every boxwood we planted with the last company was dead in fourteen months. Groundwork's 18-month walk showed 91 out of 96 plants thriving. That's a different business entirely.

Carol Hutchins, Regional Property Manager, Sentinel Commercial REIT
Portfolio

Thirty-seven projects.
Zero do-overs.

From a half-acre residential garden in Westlake to a four-phase commercial campus in Round Rock — every project documented, every result measured.